School Project 3

Project area:

  • the total area of the original classroom is about 77 square meters;
  • It is divided into Grooming teaching area of 49 square meters and bathing teaching area of 28 square meters;
  • Equipment budget: USD 16,000 (excluding construction costs of water and electricity transformation, classroom partition, etc.);

 

Working station:

  • Grooming teaching area: 1 teacher station + 1 assistant teacher station + 28 student working stations;
  • Bathing teaching area: 8 bathing teaching stations + 2 foster cages;
  • Estimated power consumption: the power consumption of teaching equipments is about 40kW, and that of air conditioning, lighting and water heaters is about 30kW.
  • Note: no original drawings.

Figure 1 (front view)

Figure 2 (overall perspective)

Figure 3 (3D rendering of Grooming teaching area)

Figure 4 (3D rendering of Grooming teaching area)

Figure 5 (3D rendering of Grooming teaching area)

Figure 6 (3D rendering of bathing teaching area)

Figure 7 (3D rendering of bathing teaching area)

Figure 8 (3D rendering of bathing teaching area)

This category is empty! Please try another category or use our search function to find what you are looking for. If you require further assistance please contact us.